Conventional technical configuration (1):

1. The PLC can communicate with the host computer in the central control room through Ethernet.

2. The PLC CPU memory is greater than 128 kBytes.

3. Total points configuration requirements: 156DI, 70DO, 11AI, 8AO. (included

margin points)

4. The PLC is connected to a 10-inch touch screen.

5. PLC controls ten frequency converters through Modbus.

Conventional technical configuration (2):

1. The PLC can communicate with the host computer in the central control room through Ethernet.

2. Each floating point operation cycle of PLC CPU is less than 7μs.

3. PLC system I/O total point configuration requirements: 97DI, 96DO, 22AI, 3AO (

Points with margin included).

4. The PLC is connected to a 7-inch touch screen.

5. PLC controls smart instruments through Modbus.

Conventional technical configuration (3):

In the first water treatment PLC control system, a total of 6 on-site PLC control stations (PLC1∽PLC6) are set up. Each PLC control station realizes linkage logic control between equipment, realizes process control and feedback control of equipment according to process requirements, and controls important equipment on site. Or start, shut down, stop and set operating parameters of the unit, and monitor the operating conditions of equipment and instruments.

Now according to the following situation description and requirements, make the optimal ABB PLC configuration for the PLC1 on-site control station (water pumping station) (including power module, CPU, I/O module, CPU and I/O base plate, remote I/O module and base plate, FBP adapter, programming cable, battery and other accessories).

Configuration:

Total point configuration requirements: AI: 90 AO: 60 DI: 130 DO: 130

Conventional technical configuration (1):

1. The PLC can communicate with the host computer in the central control room through Ethernet.

2. The PLC CPU memory is greater than 128 kBytes.

3. Total points configuration requirements: 156DI, 70DO, 11AI, 8AO. (included

margin points)

4. The PLC is connected to a 10-inch touch screen.

5. PLC controls ten frequency converters through Modbus.

Conventional technical configuration (2):

1. The PLC can communicate with the host computer in the central control room through Ethernet.

2. Each floating point operation cycle of PLC CPU is less than 7μs.

3. PLC system I/O total point configuration requirements: 97DI, 96DO, 22AI, 3AO (

Points with margin included).

4. The PLC is connected to a 7-inch touch screen.

5. PLC controls smart instruments through Modbus.

Conventional technical configuration (3):

In the first water treatment PLC control system, a total of 6 on-site PLC control stations (PLC1∽PLC6) are set up. Each PLC control station realizes linkage logic control between equipment, realizes process control and feedback control of equipment according to process requirements, and controls important equipment on site. Or start, shut down, stop and set operating parameters of the unit, and monitor the operating conditions of equipment and instruments.

Now according to the following situation description and requirements, make the optimal ABB PLC configuration for the PLC1 on-site control station (water pumping station) (including power module, CPU, I/O module, CPU and I/O base plate, remote I/O module and base plate, FBP adapter, programming cable, battery and other accessories).

Configuration:

Total point configuration requirements: AI: 90 AO: 60 DI: 130 DO: 130

Copyright © 2024 赣州众业电气有限公司 All Rights Reserved 赣ICP备2023009681号